Skip to content
FindingsAppsBalane GraphicsArticlesVideosExperiment
DETry it
  • Findings
  • Apps
  • Balane Graphics
  • Articles
  • Videos
  • Experiment
  1. Balane Office
  2. /
  3. Slides
  4. /
  5. Swimlane diagram

Making a swimlane diagram: structure, rules and tools

A swimlane diagram shows a process with one lane per role or team. This page covers how to build one and what matters. Slides will soon get a process graphic of its own for it, which can also be shown as a process chain.

SoonBuilt and tested, ships with the next version of SlidesFree, no account
All about Slides
Order processSalesOperationsFinanceRequestCheckFeasible?InvoiceDeclineYesNo
Illustration: Swimlane diagram

What it does

Lanes, steps, decisions
Coming to Slides: every step sits in a lane. Start, step, decision, end, document and data have their own shapes; short notes appear as bullet points inside the step.
Flowchart or process chain
The same dataset can appear as a flowchart or as a process chain, horizontal or vertical. The choice is saved in the file.
Yes/no branches
A plus button on the selected step adds the next step and its connector. Decisions can get a yes/no branch with two labelled connectors, each as a single undo step.
Data sheet in the inspector
Under “Flow data” you edit the graphic title, flow direction, lanes, steps and connections: add, rename, reorder and delete.
Paste from spreadsheets
“Paste from table” takes rows with a step column and an optional note column and appends them as a connected sequence.
Export as shapes
Saved as PPTX or ODP, every step arrives as a separate, editable shape; notes stay editable text.

What a swimlane diagram is

A swimlane diagram is a flowchart with lanes. Each lane stands for a role, a team or a system, and each step sits in the lane of whoever does it. You see not just the order of steps but also who is responsible and where work changes hands.

The format is older than the software used to draw it today. Multi-column process charts existed as early as the 1940s; Geary Rummler and Alan Brache popularised the name “swim lane” in their 1990 book “Improving Performance”. Other names are cross-functional flowchart and Rummler-Brache diagram. In the BPMN modelling notation, the lanes are called lanes and sit inside pools.

Those handovers are usually the point. In consulting decks, a current-state process shows where waiting and back-and-forth happen, and a target process shows how things should run afterwards. In reports, the diagram explains approvals, purchasing or onboarding.

Slides with a selected process graphic “Purchasing process” in three lanes: the employee creates the request, the team lead checks “Over €1,000?” with a Yes branch to “Approve” and a No branch to Purchasing, which places the order; the inspector on the right shows view “Flowchart” and “Flow data”.
Preview from the development build: a purchasing process with three lanes and a yes/no branch.

How to structure a swimlane diagram

Start with the people involved: every role that does something in the process gets a lane. Three to five lanes read well on one slide. Roles that are only kept informed don’t need a lane of their own.

Then the start and end: a clear trigger, such as “Need identified”, and a clear result, such as “Goods received”, frame the process. In between, steps are written as activities with a verb, “Review quote” rather than “Quote”.

Finally the decisions: each diamond asks a question that can be answered yes or no and has exactly two labelled exits. Where a process loops back, for example after a rejection, a return connection shows the way.

Swimlanes in PowerPoint, Visio and modelling tools

In PowerPoint, swimlanes are usually drawn by hand: rectangles as lanes, shapes for the steps and connectors in between. It works, but every new lane or inserted step means realigning shapes. Microsoft Visio offers a dedicated template for cross-functional flowcharts.

For processes that are automated or documented in depth, people use BPMN tools. They know events, gateways and message flows, but are often too detailed for a slide.

Slides takes a middle path: the process is a dataset of lanes, steps and connections, and the graphic is generated from it. If you insert a step, you don’t have to move anything by hand.

Slide “Order process” with a process chain in the Sales lane: Request, Quote, Order, Delivery and Invoice side by side with arrows; the inspector shows the view set to “Process chain”.
An unbranched process in the “Process chain” view (development build).

Flowchart or process chain: the same data

A process chain shows a straight sequence of steps, often as a slide header or an overview of phases. You need a flowchart as soon as there are decisions, branches or several parties involved.

In Slides that will be a question of display, not a new diagram. The chain view is available for a single unbranched sequence in one lane. If you add a branch or a second lane later, the change is kept, the diagram switches visibly to a flowchart and tells you why.

Current and target: two slides, one comparison

In consulting projects a swimlane diagram rarely stands alone. The usual pair is the current process with all its loops and waiting times, and next to it the target process, which removes steps or saves handovers. For the comparison to work, both slides keep the same lanes in the same order.

It helps to name the pain points in the current process right at the step, with a short note such as “waits three days on average”. In Slides such notes appear as a bullet inside the step and are kept as text on export.

When a swimlane diagram is the wrong choice

When a process has dozens of steps, exceptions and loops, the slide becomes unreadable. Then it helps to split it into sub-processes or to use a modelling tool. The slide should carry the version you are discussing.

If the point is dates and durations rather than responsibilities, a Gantt chart is the better form. And if one person handles every step, a process chain or a numbered list is enough.

Common swimlane mistakes

Steps without an owner: a step floating between two lanes blurs exactly the point the diagram is drawn for. Every step belongs in exactly one lane.

Unlabelled decisions: two arrows leaving a diamond without “Yes” and “No” leave the audience guessing. Crossing lines are a sign that lanes or steps should be ordered differently. Often swapping two lanes is enough to make most arrows run in one direction.

How it works

  1. 1

    Insert a process graphic

    Once the feature ships: in Slides, choose “Insert process flow” in the toolbar or the Insert menu. A small example with start, step and end appears.

  2. 2

    Add lanes and steps

    Expand “Flow data” in the inspector, add the roles with “Add lane” and the steps with “Add step” or “Paste from table”. Choose a shape, lane and note for each step.

  3. 3

    Connect and branch

    Under “Connections”, create and label arrows with “From step”, “To step” and “Add connection”. On the slide, the plus button adds the next step, and on decisions it adds a yes/no branch.

  4. 4

    Choose the view

    Under “Presentation”, choose flowchart or process chain, and set the flow direction to horizontal or vertical in the flow data.

  5. 5

    Save or export

    In the .bslides file the process stays fully editable. As PPTX or ODP it becomes a group of editable shapes.

At a glance

Status in Balane
coming soon to Slides
Views
Flowchart, process chain
Shapes
Start, step, decision, end, document, data
Paste
Spreadsheet rows with step and note
Export
PPTX, ODP as shapes
Also in
Documents, Reports

Limits

What the feature can’t do yet, or what hasn’t been tested.

  • The process graphic is built in a first version and covered by tests, but not released yet. The images come from the development build; a hands-on check with mouse and touch in the finished app is still pending.
  • Connector paths can’t be edited by hand, and there’s no automatic routing that avoids crossings.
  • In the inspector’s data sheet, wide fields are cut off at the side at the usual window width; for longer editing sessions a wider window helps.
  • In PowerPoint and LibreOffice, the connectors are free lines that aren’t attached to the shapes. Move a step there and the line stays put. Changes made in Office don’t flow back into the .bslides file.
  • In Documents, the process appears in Word and ODT files only as text or alt text, not as a graphic with shapes.

Frequently asked questions

What’s the difference between a swimlane diagram and a flowchart?

A swimlane diagram is a flowchart with lanes. The flowchart shows the order of steps; the lanes also show who does each step.

How many lanes fit on a slide?

Three to five read well. With more parties involved, it’s worth merging roles or splitting the process into sub-processes.

Can I keep editing the swimlane diagram in PowerPoint?

Yes, as shapes: steps and labels can be changed one by one in PowerPoint. The connector lines don’t follow when you move a shape, though. To edit it as a process with lanes, keep working in Slides.

Can I bring a process over from Excel?

Yes, as a list: copied rows with a step column and an optional note column are appended as a connected sequence via “Paste from table”. You add lanes and branches afterwards in the data sheet.

Which symbols does a swimlane diagram need?

Four are usually enough: start, step, decision and end. Document and data cover paperwork and storage. Slides offers exactly these six shapes.

When is the process graphic coming to Slides?

A first version is built and will ship with an upcoming released version. Slides is free; there’s no date yet.

GuidesWhich chart for which message→

Related

  • Gantt chartSlides→
  • Edit PowerPoint filesSlides→
  • Stacked chart totalsSlides→
  • Waterfall chartSlides→
  • Marimekko chartSlides→
  • Presenter viewSlides→
  • Harvey ballsSlides→
  • Slide checkSlides→

Balane Office is a long-running experiment: nine office apps, mostly built with AI. The apps are free and save to your own device. About the experiment →

As of Nov 18, 2026

I’m building Balane Office and documenting the decisions, tests and bugs. Nine areas, one open experiment.

AppsDocumentsSheetsSlidesFormsReportsMailContent PlannerPaperworkDialogBalane GraphicsAll features →Chart types
FindingsFindingsExperimentVideosArticle series on hoettler.com ↗Try it
BalaneDevelopment preview noticeLegal noticePrivacySecurity

© 2026 BALANE GmbH

Balane OfficeBalane Office